Bulk dependency updates (Renovate) #16

Merged
alice merged 6 commits from feat/renovate-update-bulk into main 2026-08-27 20:49:29 +00:00
Owner

Incorporated: #4 (miekg/dns), lib/pq 1.10.9->1.12.3 (no open PR — branch update only), #8 (prometheus/client_golang, plus go mod tidy fixups after merge conflict resolution), #9 (opentelemetry-go-contrib otelhttp), opentelemetry-go monorepo 1.43.0->1.46.0 (no open PR — branch update only, plus a follow-up go mod tidy fixup), #5 (gorm.io/driver/postgres, plus go mod tidy) — this transitively bumped gorm.io/gorm to v1.31.2, satisfying #10 without a separate cherry-pick, #3 (mattn/go-sqlite3, verified via CGO_ENABLED=1 go test ./internal/db/...), docker.io/library/golang 1.25->1.27 (no open PR — branch update only), #13 (actions/checkout v7), #14 (actions/setup-go v7). All left out: none — every open Renovate PR for this repo is incorporated. CGO_ENABLED=1 go build ./..., go vet ./..., and go test ./... all verified clean on the final branch.

Incorporated: #4 (miekg/dns), lib/pq 1.10.9->1.12.3 (no open PR — branch update only), #8 (prometheus/client_golang, plus go mod tidy fixups after merge conflict resolution), #9 (opentelemetry-go-contrib otelhttp), opentelemetry-go monorepo 1.43.0->1.46.0 (no open PR — branch update only, plus a follow-up go mod tidy fixup), #5 (gorm.io/driver/postgres, plus go mod tidy) — this transitively bumped gorm.io/gorm to v1.31.2, satisfying #10 without a separate cherry-pick, #3 (mattn/go-sqlite3, verified via `CGO_ENABLED=1 go test ./internal/db/...`), docker.io/library/golang 1.25->1.27 (no open PR — branch update only), #13 (actions/checkout v7), #14 (actions/setup-go v7). All left out: none — every open Renovate PR for this repo is incorporated. `CGO_ENABLED=1 go build ./...`, `go vet ./...`, and `go test ./...` all verified clean on the final branch.
gorm.io/driver/postgres v1.6.2 pulled gorm.io/gorm to v1.31.2 as a
transitive resolution, which is exactly what the separate
gorm.io/gorm 1.30.0 -> 1.31.2 renovate PR wanted -- so that PR is
already satisfied, no separate cherry-pick needed.
ci(github-action)!: Update action actions/setup-go ( v4.3.0 → v7.0.0 )
All checks were successful
service-dmarc-api CI / build-and-push (pull_request) Successful in 3m48s
Go lint / lint (pull_request) Successful in 4m7s
e749a61dfa
alice merged commit 692f58b100 into main 2026-08-27 20:49:29 +00:00
alice deleted branch feat/renovate-update-bulk 2026-08-27 20:49:29 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
dmarc-ing/service-dmarc-api!16
No description provided.