Bulk dependency updates (Renovate) #12

Open
gitea_admin wants to merge 9 commits from feat/renovate-update-bulk into main
Owner

Incorporated: #2 (@vitejs/plugin-react 6.x), #5 (vite 8.x), #6 (react major), #4 (react-router-dom v7), #10/#9/#8 (node/actions/setup-node/checkout bumps), #1 (Dockerfile node 24). Left out: #3 (eslint 8->10) -- eslint-plugin-react@7.37.5's peer dependency only supports eslint up to ^9.7, so this genuinely cannot be taken yet without an eslint-plugin-react update first, not just a small fix. Also included an unrelated .eslintignore fix for dist/ (same gap already fixed in render-dmarc-ui). npm install/lint/build all verified clean.

Incorporated: #2 (@vitejs/plugin-react 6.x), #5 (vite 8.x), #6 (react major), #4 (react-router-dom v7), #10/#9/#8 (node/actions/setup-node/checkout bumps), #1 (Dockerfile node 24). Left out: #3 (eslint 8->10) -- eslint-plugin-react@7.37.5's peer dependency only supports eslint up to ^9.7, so this genuinely cannot be taken yet without an eslint-plugin-react update first, not just a small fix. Also included an unrelated .eslintignore fix for dist/ (same gap already fixed in render-dmarc-ui). npm install/lint/build all verified clean.
All checks were successful
JS lint / lint (pull_request) Successful in 40s
render-dmarc-www CI / build-and-push (pull_request) Successful in 1m13s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin feat/renovate-update-bulk:feat/renovate-update-bulk
git switch feat/renovate-update-bulk

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff feat/renovate-update-bulk
git switch feat/renovate-update-bulk
git rebase main
git switch main
git merge --ff-only feat/renovate-update-bulk
git switch feat/renovate-update-bulk
git rebase main
git switch main
git merge --no-ff feat/renovate-update-bulk
git switch main
git merge --squash feat/renovate-update-bulk
git switch main
git merge --ff-only feat/renovate-update-bulk
git switch main
git merge feat/renovate-update-bulk
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
dmarc-ing/render-dmarc-www!12
No description provided.