Bulk dependency updates (Renovate) #5

Open
gitea_admin wants to merge 4 commits from feat/renovate-update-bulk into main
Owner

Consolidates 3 open Renovate PRs into a single branch, cherry-picked in dependency-risk order and verified to build/vet/test at each stage.

Incorporated:

  • #1 fix(deps): update module github.com/miekg/dns v1.1.56 -> v1.1.73 - cherry-picked, plus a follow-up commit running go mod tidy (go.sum update) and bumping the go.mod language directive from 1.22 to 1.25.0, since miekg/dns v1.1.73 itself requires go 1.25.0. No source code changes were needed.
  • #3 ci(github-action)!: Update action actions/checkout v4.4.0 -> v7.0.1 - cherry-picked cleanly (auto-merged with the setup-go bump in the same workflow file).
  • #4 ci(github-action)!: Update action actions/setup-go v4.3.0 -> v7.0.0 - cherry-picked cleanly.

All three original PRs are incorporated; none were left out.

Verification performed on this branch:

  • go build ./..., go vet ./..., go test ./... all pass clean.
  • .forgejo/workflows/lint.yml and .forgejo/workflows/bump-tag.yaml parse as valid YAML after the action version bumps (no build-and-push workflow exists in this repo).
Consolidates 3 open Renovate PRs into a single branch, cherry-picked in dependency-risk order and verified to build/vet/test at each stage. Incorporated: - #1 `fix(deps): update module github.com/miekg/dns v1.1.56 -> v1.1.73` - cherry-picked, plus a follow-up commit running `go mod tidy` (go.sum update) and bumping the `go.mod` language directive from 1.22 to 1.25.0, since miekg/dns v1.1.73 itself requires go 1.25.0. No source code changes were needed. - #3 `ci(github-action)!: Update action actions/checkout v4.4.0 -> v7.0.1` - cherry-picked cleanly (auto-merged with the setup-go bump in the same workflow file). - #4 `ci(github-action)!: Update action actions/setup-go v4.3.0 -> v7.0.0` - cherry-picked cleanly. All three original PRs are incorporated; none were left out. Verification performed on this branch: - `go build ./...`, `go vet ./...`, `go test ./...` all pass clean. - `.forgejo/workflows/lint.yml` and `.forgejo/workflows/bump-tag.yaml` parse as valid YAML after the action version bumps (no build-and-push workflow exists in this repo).
go mod tidy to update go.sum for the new module version; bumps the
go.mod language version directive to 1.25.0 since miekg/dns v1.1.73
itself requires it.
ci(github-action)!: Update action actions/setup-go ( v4.3.0 → v7.0.0 )
All checks were successful
Go lint / lint (pull_request) Successful in 1m48s
720f68ef12
All checks were successful
Go lint / lint (pull_request) Successful in 1m48s
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin feat/renovate-update-bulk:feat/renovate-update-bulk
git switch feat/renovate-update-bulk

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff feat/renovate-update-bulk
git switch feat/renovate-update-bulk
git rebase main
git switch main
git merge --ff-only feat/renovate-update-bulk
git switch feat/renovate-update-bulk
git rebase main
git switch main
git merge --no-ff feat/renovate-update-bulk
git switch main
git merge --squash feat/renovate-update-bulk
git switch main
git merge --ff-only feat/renovate-update-bulk
git switch main
git merge feat/renovate-update-bulk
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
dmarc-ing/cli-test-dns!5
No description provided.